five-star hotel/high-end project bidding?

five-star hotel/high-end project bidding?

According to the past experience of Longmeida Company and the basic rules of the industry, stone enterprises to undertake five-star hotels or headquarters office buildings and other high-end projects of stone supply, generally should meet the basic requirements are as follows:

1. All plates are 20±1mm thick and will never cut corners.

2. All stone materials shall be treated with waterproof adhesive, waterproof, anti-fouling, anti-seepage, shovel-free net, anti-air drum, anti-crushing and easy to paste.

3. The gloss of the board surface reaches the national standard of more than 5 °.

4. The flatness, dimensional accuracy and interface smoothness of the board shall be higher than the national standard for superior products.

5. Party A can seal large plates in the stone factory according to the confirmed samples before supply as the criteria for material selection and acceptance.

6, all stone in addition to the back net adhesive surface, five sides must do waterproof treatment, in the waterproof treatment before the stone must be dry, to ensure that waterproof liquid into the stone depth of not less than 3mm.

7. When supplying, waterproof labels must be pasted on the upper right corner of the front of each board, indicating the installation direction, house type, use position, elevation, number and other information, so that the construction unit can construct according to the number.

8. The bottom plate of the stone wooden box is made of 25mm thick wood board, the surrounding baffle is reinforced with 20mm thick wood board, the inner circumference is wrapped with 5mm film, the middle of each board is separated by film, and packed according to the same elevation/same room/same floor, and each box is packed with about 20~25 square meters. Try to pack the same box with the facade. Separate packaging of different floors or different rooms to avoid confusion. The corresponding packing list is set on the wooden box. The wooden box is equipped with corresponding typesetting drawings. The outside of the wooden box is wrapped with waterproof stretch film to prevent rainwater from penetrating.

9. It is required to complete at least 3 five-star hotel cases with the same grade within one year.

10. The scale of the factory should meet the requirements of independent completion from the mine to the construction site, without outsourcing.

11. Ensure that the production and processing are arranged according to the construction period and quality requirements in the technical tender, ensure that the stone processing and quality requirements of the project are met, and promise the relevant responsibilities.

12. Factory technicians shall be resident on the construction site, provide all-round services unconditionally, and solve various problems encountered on site.

13. Implement a one-year warranty period for the project. During the warranty period, professional after-sales personnel will keep in touch with the owner to provide the first-time solutions to problems that arise.

14. The factory strictly implements the policy of scientific and technological innovation and green production, and enterprises and products actively tackle key problems in technology, which can conform to the mainstream trend of stone industry development in the new era.

Topteck Stone Group    News    Question    five-star hotel/high-end project bidding?